
Hydra Engineering & Construction was the Prime Contractor for this project located in Georgia. Hydra constructed a 3 Ft High rip rap Coffer Dam Across a Scour Hole Outlet, while installing, maintaining and operating all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow. The project also consisted of the construction of rock rip rap revetments and blankets, including filter or bedding where specified.